  1. Of course, the installation of the dust collector equipment of the cement plant does not need to be questioned, and the cement plant is also one of the key industries of the national environmental protection department’s positioning pollution. Cement plants are mainly serious pollution of atmosphere. The production operation of the cement plant is contact dust. Whether it is raw material broken or to the finished packaging, the entire production process produces dust everywhere causes pollution to the surrounding environment. Human health.

    With the adjustment of China’s cement industry policy, the large -scale cement production process line, these large cement production lines have a large number of dust collectors, kiln head and kiln tail dust removal. The key to emissions. The cement industry mainly controls the discharge of smoke and dust, so the cement plant must install the dust removal equipment. So what equipment does the cement plant be installed? Bag dust collector, stand -alone cloth bag vein, is the most effective equipment for controlling particles, especially PM2.5 ultra -fine particles. The filtering material is its core. In response to the characteristics of the smoke and dust in the cement industry, we adopt a customized design scheme in engineering and equipment to optimize design and supporting technology applications in order to significantly reduce the volume of the overall granules of the cement industry.

  2. Whether it is a high -rise building, a wide road, and a magnificent building, the cement is inseparable in the process of construction. In recent years, the number of cement plants has risen rapidly, which is enough to prove the development of the industry, but we all know The production of cement plants is a type of pollution very serious. If it is not dealt with in time, it will cause great pollution for the production place and the surrounding environment. We can use their imagination. The amount of dust generated by different processes and the ingredients contained in it is also different. For example, in the firing stage, the cement will produce sulfur dioxide and oxides such as toxic gases. So what if the dust governance of the cement plant is not timely?
    1. Those who understand cement production must know that the cement plant must go through “two grinds and one burning” during the production of cement. Limestone), it has not been reduced until the production of cement production has been completed. If it is not cleaned in time, it will hurt greatly for the health of the on -site staff. Pneumoconiosis.
    2. There are great losses to the economic benefits of the cement plant. As the national environmental protection department pays more and more attention to the management of dust, if the corporate dust management does not meet the standard, it is likely to be ordered to discontinue production and rectification. It may be closed, no matter which result, it will bring economic losses to the cement plant and cannot develop for a long time.
    3, the dust management of the cement plant is not in place, it also has a great impact on the surrounding environment. Some sand and gravel farms are often foggy, and the surrounding crops are all gray. It was covered with a layer of dust and seemed unparalleled. It brings great inconvenience to the lives of surrounding residents. The problem will return to the second point. If the dust of the cement plant is not dealt with in time, the lives of the surrounding residents will be affected, and the complaints will still allow the factory to stop production and rectification.
    4, the cement plant does not dust dust or the dust control of dust treatment is not in place. In the long run, dust in all corners of the workshop, especially if it falls on the production equipment ACCIDENT.
    5. Some dust generated by cement during production can still be recycled. If it is not treated in time, it will cause waste of resources and increase investment costs.
    In above, we can see that the dust of the cement plant is not governed, the dust removal system is not installed, and the accumulation of dust is not good. Therefore, the dust management of the cement plant must be on the agenda and achieve environmental protection early.

  3. The dust collector must be installed. Screening, crushing, transfer, cement kiln. Many places are used, but they are not large.