What are the larger hydropower stations in Sichuan? (For the installation capacity of more than 500,000 kW)

Hello everyone, who knows: Which biggest hydropower stations in Sichuan? Including their specific location. (The installed capacity is above 500,000 kW or more) Thank you!

3 thoughts on “What are the larger hydropower stations in Sichuan? (For the installation capacity of more than 500,000 kW)”

  1. Project introduction
    The investment project of four hydropower stations in Sichuan Province

    Hydropower stations:
    installed capacity: 42,000/kW;
    Total investment: 288 million yuan (budget for calculations );
    year -old power generation: 198.57 million DW.H
    Themnet electricity price: 0.345 yuan /KW.H;
    total runoffs: 107-12.2 billion cubic meters;
    rainstorm rain Area: 14522 square kilometers
    -unit kilowatt investment: 6500 yuan/kW;
    annual number of installed machines: 4728 hours;
    N reservoir level: third -class project (level 3 of main buildings, level 4 of the secondary building, level 5 of the building, level 5 of the channel);
    Total reservoir height: 57 million cubic meters;
    The normal water storage level: 395 meters;
    Total assets: Invest in the early stage of nearly 10 million yuan;
    Total income: 68.5 million yuan;
    net profit: 13.7 million yuan.
    The project is not completed: “Research Report” and “First Report”, etc., have been approved by the Sichuan Provincial Development and Reform Commission, waiting for funds to be in place.
    Transfer price: 10 million yuan
    Investment (cooperation) Method: Solerant of or other methods
    The relevant information provided: 1. “Research Report” 2. “Water Security Plan” 3. ” EIA Plan “4.” First Report “5,” Access System Research Report “6,” Report on the Internet Electricity Price “7,” Entry Network Copy “
    Note: 1. Level 3, gauze type.
    2, the original need to repair the ship, to increase the investment of 20%, it can now be built.

    The hydropower station 2:
    installed capacity: 36,000/kW;
    Total investment: 250 million (budget);
    years of power generation: 14,200 DW.H
    -grid electricity price: 0.27 yuan /KW.H;
    Total runoff: an average of 18 billion cubic meters for many years;
    The rain area: 22,900 square kilometers;
    KMC Investment: 7000 Yuan/KW;
    The annual number of installations: 4000 hours;
    Dishes: 21 meters; normal water storage level: 500 meters;
    Total assets: preliminary survey, planning 1 million yuan;
    The project is not completed: The project has been included in the Sichuan and Chongqing integrated development plan, which belongs to the third -level hydropower station in the watersheds in Sichuan. No construction has been carried out, and investment is missing.
    Transfer price: 1 million yuan